Ir directamente a la información del producto
1 de 5

Men's Curved Basketball Shoes With Thick Soles

Men's Curved Basketball Shoes With Thick Soles

Precio habitual $166.78 USD
Precio habitual Precio de oferta $166.78 USD
Oferta Agotado
Los gastos de envío se calculan en la pantalla de pago.

Complete with eyelets and a lace up closure for a classic look

  • The upper is made of PU, and the sole is made of Rubber
  • Feature: Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbent
  • Season: Autumn, Spring, Summer, Winter
  • Occasion: Outdoor, Sports
  • Gender: Men
  • Care Instruction: Spots clean only
  • Custom area is the upper, for custom areas please refer to yoycol mockup generator for details 
  • This product is made on demand. No minimums
  • Multiple shipping options available, and cost varies on time efficiency.

Size Guide

 

EUR Size US Size Insole Length inch Insole Length mm
39 6 9.9 251
40 7 10.2 259
41 8 10.5 266
42 8.5 10.6 270
43 9.5 10.9 278
44 10 11.1 283
45 11 11.4 290
46 12 11.7 296
47 12.5 11.9 303
48 13 12.2 311
49 14 12.5 318
50 15 12.7 323

 

Product measurements may vary by up to 3~5mm

EU representative: Europe Gateway International B.V., info@euegi.nl, Kraijenhoffstraat 137 A, Amsterdam, 1018RG, the Netherlands

Color
Shoe size
Cantidad

999 en existencias

Ver todos los detalles